Replacing the Roof Around a Chimney? Put the Cricket Scope in Writing
Quick Answer: Before approving a full roof replacement around a chimney, ask the roofer to state whether a cricket is required for this chimney and roof, what rule or design detail applies locally, and whether it is included in the price. Put the cricket material, tie-in with the new roof and flashing, and concealed-damage approval process in the written scope. Do not climb to measure or inspect it.
On this page
Applicability and model notes
For a homeowner comparing or approving a complete roof covering replacement where a chimney interrupts the roof plane. This is a proposal and change-order planning guide, not a roof-access or chimney-repair procedure.
- A cricket is a small diverter on the uphill side of an obstruction. Whether one is required depends on the applicable code, dimensions, roof assembly, and local adoption; ask the roofer and local building department rather than assuming a universal rule.
- A roof-to-chimney water problem can involve roof flashing, masonry, or both. This guide does not diagnose a chimney leak.
Symptom checks
A reroof proposal excludes the chimney detail or says ‘as needed’
First check: Ask for a drawing or written line item stating whether a cricket applies, its scope, and how it ties into the new roof and flashing.
A cricket is introduced as an extra after reroofing has started
First check: Request the applicable requirement or design basis, price, and written approval before the added work proceeds.
Diagnostic Checks
Resolve the chimney cricket before the crew reaches it
Tools needed: Roof proposal and any change order, Phone camera for ground-level context, Paper or spreadsheet for line-item comparison
- Ask the roofer to document the chimney width across the roof slope, the proposed cricket dimensions, and whether the locally adopted code or project design requires it. If the roofer cites a code section, verify the adopted edition and amendments with the local building department; do not infer applicability from a model code alone. What to look for: The requirement has a stated basis tied to the actual chimney and jurisdiction, rather than an unexplained late add-on.
- Have the base proposal identify whether the cricket is included. If it is a change order, ask for the added amount, what materials and labor it covers, how it connects with underlayment and roof covering, and the flashing scope at the chimney. Compare the description with the roofer’s drawing or written detail. What to look for: The price comparison separates the cricket and flashing work from the rest of the reroof.
- Ask what happens if removal exposes damaged sheathing or framing: request unit pricing or an allowance, photo documentation, and written homeowner approval before extra work begins, except where immediate stabilization is needed for safety. What to look for: The contract identifies how concealed conditions will be documented, priced, and authorized.
- Keep the signed scope, any approved change order, progress photos supplied by the roofer, final invoice, and warranty contact together. At closeout, compare the paperwork against the stated cricket and flashing scope; do not attempt a close roof inspection yourself. What to look for: The completed work and callback contact can be traced to the approved scope.
Stop and get qualified help when
Have the roofing contractor make and document elevated measurements and observations.
Pause the scope discussion and request written documentation and approval before the work proceeds.
How to Check the Result
- Before work, the written scope says whether a cricket applies and is included, or provides a separately approved price and detail.
- After work, retain the signed change order and closeout records; report any new interior moisture with date and weather conditions.
Professional repairs
Roofing contractor for a complete reroof
Ask a licensed or locally qualified roofing contractor to document the chimney measurement, applicable local requirement or design basis, cricket and flashing detail, and concealed-condition approval process as part of the full roof replacement.
Community discussions
These are individual reports, not verified repair instructions. Outcomes may not apply to your equipment.
A new roof leaked near the chimney after heavy rain, and the homeowner was presented with a cricket charge after work began.
Attempted: The homeowner asked the community whether a roughly $500 cricket change order was normal and whether it was code-required; commenters raised roof flashing and masonry as separate possible paths.
The post did not establish the locally adopted rule, the leak cause, or a completed repair. It illustrates why a late added requirement and chimney scope should be documented before authorization.
When this may apply: Use only to motivate written scope and local requirement verification; the case does not prove the change order was valid or invalid.
Frequently asked questions
Does every chimney need a cricket?
Does a cricket replace chimney flashing?
References & sources
-
Chimneys Connected to Roof StructureBuilding America Solution Center, Pacific Northwest National Laboratory
Applies to: General building guidance; project-specific details depend on the roof and chimney assembly.
Describes roof-to-chimney water management, flashing integration, and cricket use to divert water around a chimney.
-
Flashing Penetrations on Existing RoofsBuilding America Solution Center, Pacific Northwest National Laboratory
Applies to: General retrofit principles, with exact details determined by the roofing assembly and manufacturer.
Explains flashing as part of the roof water-control assembly around penetrations; details should be integrated with roof layers.
-
2024 International Residential Code, Chapter 9 Roof AssembliesInternational Code Council
Applies to: Use only as a prompt to verify the locally adopted requirement; not a legal determination for any specific property.
Section R903.2.2 addresses crickets and saddles on the ridge side of chimneys and other roof projections wider than 30 inches measured perpendicular to roof slope. This is model-code text; local adoption and amendments control.
-
Is this normal? New roof leaks and cricket installReddit · r/Roofing
Applies to: One homeowner report, not confirmation of code applicability or leak cause.
Homeowner said a new roof leaked near the chimney after heavy rain and reported a $500 cricket change order introduced after work began as code-required. Comments discussed possible roof flashing and masonry distinctions. No final diagnosis or completed repair was reported.