Replacing a Roof and Gutters? Coordinate the Work Sequence

GuttersTroubleshooting guide Updated

Quick Answer: If a roof and gutters both need work, get both scopes coordinated before either contractor starts. Ask who removes and reinstalls the gutters, when drip edge and roof-edge flashing are installed, how runoff enters the gutter, who protects or replaces damaged fascia, and which contractor owns a leak callback. Put the sequence and handoffs in writing.

On this page

Applicability and model notes

For homeowners planning an asphalt-shingle roof replacement and gutter replacement or removal/reinstallation. This guide coordinates contractor scopes and water-shedding details; it does not instruct homeowners to access the roof.

Symptom checks

Roof and gutter work are scheduled by separate contractors or in different seasons

First check: Compare each written proposal to see who removes, stores, reinstalls or replaces the gutters and who is responsible for the roof-edge handoff.

Diagnostic Checks

Write down the sequence and roof-edge handoff

Diagnostic checkLow; Paperwork Coordination Only.A roof replacement is planned while existing gutters also need replacement or must be removed and reinstalled.

Tools needed: Roof and gutter proposals, Ground-level photographs and a written responsibility checklist

Safety first: Do not climb or walk the roof, remove gutters, or inspect flashing yourself. Keep all field measurements and concealed-condition checks with the contractors.
  1. Ask the roofer and gutter installer to agree in writing when gutters are removed, whether they will be reused, how they will be protected, and which trade reinstalls them after roofing work. What to look for: Each task has a named contractor and sequence; no trade assumes the other will return.
  2. Ask the roofer to identify the specified drip edge, underlayment and flashing at eaves, and ask the gutter installer to explain how the finished roof edge drains into the gutter without cutting or bending the roof flashing. What to look for: Both proposals describe a compatible roof-to-gutter water path and identify any site-specific detail requiring a joint inspection.
  3. Confirm who inspects and prices damaged fascia or decking, what photo evidence is provided before concealed replacement, unit rates or allowances, and who obtains approval for added work. What to look for: Concealed material repairs have a clear change-order process and are not left to a disputed handoff.
  4. Ask which contractor checks the first safe rainfall for water behind the gutter or at joints, how the concern is reported, and which workmanship warranty applies to the roof-edge interface. What to look for: There is a written point of contact and a way to resolve interface leaks without guessing which trade owns them.

Stop and get qualified help when

A contractor asks you to inspect the roof edge from a ladder or roof

Do not perform elevated inspection; ask the contractor to document the interface and scope.

Fascia or deck is found to be rotten or structurally damaged

Have the qualified contractor evaluate the concealed condition and provide written scope before proceeding.

How to Check the Result

  • Before work begins, both contracts name the removal/reinstallation sequence, compatible roof-edge handoff, fascia allowance and change-order approval.
  • After completion, review photos or contractor records for the finished roof edge and observe runoff from the ground during the next safe rain; report any leak to the agreed callback contact.

Professional repairs

Roofing contractor and gutter installer

Require coordinated written scopes, compatible roof-edge details, contractor responsibility for removal and reinstallation, fascia allowances, and shared callback ownership.

Community discussions

These are individual reports, not verified repair instructions. Outcomes may not apply to your equipment.

A homeowner planning to replace asphalt shingles and gutters asked whether the gutter or roof work should happen first.

Attempted: The homeowner solicited trade advice about keeping the roof-edge flashing and gutter connection compatible.

Commenters discussed removing gutters before roof work and reinstalling after, while others described different contractor sequencing. The original poster did not report a completed project.

When this may apply: The thread illustrates the coordination problem but does not establish a universally correct sequence or verified outcome.

Frequently asked questions

Can gutters be installed after the new roof?
The appropriate sequence depends on the roof system and contractor scopes. Have both trades state how gutters are removed and reinstalled and how the drip edge and roof flashing drain into the gutter before agreeing to a schedule.

References & sources

  • Asphalt Shingle RoofsBuilding America Solution Center, Pacific Northwest National Laboratory

    Applies to: General asphalt-shingle systems; exact details vary by manufacturer, assembly and local code.

    Installation and retrofit scope: underlayment, flashing, drip edge and water-management details are parts of an asphalt-shingle roofing assembly; follow applicable product instructions and local code.

  • Gutter and shingle replacement sequenceReddit · r/Roofing

    Applies to: Thread illustrates the handoff question; advice is not manufacturer instruction, not a verified result, and does not establish one sequence for every roof.

    Original post and replies: homeowner planning asphalt-shingle roof and gutter replacement asked whether to replace gutters before or after roofing; replies suggested roof then gutters, with differing sequencing comments.